The structural reinforcement works using telescopic joists by MecanoVihttps://www.mecanoviga.com/ga in a fire-damaged floor structure in a building in Barcelona have now been completed. The structure consisted of a ceramic joist floor system, and the works involved installing the reinforcement beneath every three joists, with intermediate transverse support elements.