Structural consolidation of a marquee at the Meliá Hotel in Barcelona, which showed a significant out-of-plumb condition of the columns. The intervention consisted of the construction of a buttress system, founded on a new foundation linked to the existing columns, with the aim of preventing future structural displacements.