Emergency action in the Edificio del Trabajo de Can Mercader de Cornellà de Llobregat due to damage to ceramic ceilings, in poor condition on the third floor due to oxidation of the internal armor. The domes of the covered plant will be dismantled in order to remove the loads from these spaces and facilitate a new waterproofing that is not currently guaranteed.
EMERGENCY STRUCTURAL CONSOLIDATION OF THE WORK BUILDING OF CAN MERCADER DE CORNELLÀ DE LL.
Ref. DAC 241457
0
-
Location
- Cornellà de Llobregat
-
Tipology
- Administrative
-
Client
- City Hall of Cornellà de Llobregat
-
Year
- 2024