Start of a set of tasks in the Breast Service wing at HUB Bellvitge, with the reinforcement of the two existing floors and the construction of a technical roof, in collaboration with the construction company Bosch Pascual and architect Diego Nakamatsu.
We highlight the installation of a hot-rolled galvanized steel structure, fully assembled dry with bolts, and the execution of two large Warren trusses due to the impossibility of reinforcing the lower floors.